N5 Ballaghaderreen to Scramoge Road

The N5 Ballaghaderreen to Scramoge Road scheme required a reliable and low-maintenance flow control solution to manage stormwater from multiple attenuation ponds. Roadstone supported the stormwater attenuation design by supplying bespoke Hydro-Brake® flow control units for 11 attenuation ponds. The solution helped achieve controlled discharge rates while reducing blockage risk and optimising pond volumes across the route.

N5 Bypass
The Challenge

Design flow control devices for 11 attenuation ponds along new N5 route, while:

  • Minimising attenuation volume requirements in each pond.
  • Ensuring blockage risks were minimised.
The Solution

For this section of the stormwater attenuation scheme, Hydro-Brakes (vortex flow controls) were preferred over conventional orifice plates for the specified discharge rates. The main advantage was that they achieved the same flow restrictions through vortex actions rather than very small openings.

The larger opening sizes of the Hydro-Brakes provided the same discharge rate as the equivalent orifice plates, therefore significantly reducing blockage risks.

The Hydro-Brakes also permitted the volume reduction of the various required attenuation ponds because discharge remains closer to the target rate over a wider head range.

Hydro-Brakes are of a robust and bespoke design, with no moving parts, self-activating, and very low maintenance. They are future-proofed by design with adjustable inlets which can accommodate future flow changes.

The Result:

By specifying bespoke Hydro-Brake vortex flow controls across all 11 attenuation ponds on the N5 scheme, the project achieved the required discharge rates while significantly reducing blockage risk compared to conventional orifice plates. The enhanced hydraulic performance enabled a reduction in attenuation pond volumes, delivering a more efficient and cost-effective drainage design. The robust, low-maintenance solution provided confidence to all stakeholders, ensuring reliable long-term operation and successful integration into the overall stormwater management strategy.

Lessons Learned

Lessons Learned

Consider Flow Control Selection Early - Flow control selection must consider blockage risk and its impact on attenuation storage requirements.

Benefits of Bespoke Hydro-Brake Design - Bespoke Hydro-Brake designs provided confidence in both performance and cost efficiency for the project.

Clear Communication for Successful Installation - Roadstone supplied all drawings, performance data, installation guidance and delivery requirements to Wills Bros.

Stakeholders

Stakeholders

Drainage Engineer - RPS Group

Main Contractor - Wills Bros