Roadstone Autumn Seminar Series

 

Roadstone would like to invite you to attend an upcoming Roadstone CPD accredited seminar in your region.  The seminars will identify some of the key changes to the Irish Building Regulations and present practical and cost-effective solutions that will contribute significantly towards efficient design and construction.

Roadstone is committed to product innovation aimed at providing building solutions to builders, contractors and designers alike.  This includes the development of the Thermal Liteblock system, manufactured in Ireland, providing excellent insulation properties which specifically mitigate heat loss at thermal bridges – a key challenge in the construction industry. The Roadstone Thermal Liteblock is also the only concrete block solution to the thermal bridging requirements of Part L of the Building Regulations.

These seminars will also present and overview of Roadstone solutions to other challenges presented from the building regulations and specifications, including:

  • Concrete to I.S. EN206 + Case studies
  • Paving + Permeable Surfacing Solutions- SuDS
  • Aggregates and Standards
  • Concrete Blocks + Part L-Case Studies

The seminar is a CPD event and will take place in a number of regions over the coming weeks. Our invited audience will be comprised of Contractors, Architects, Engineers, designers and professional representatives from across the sector. This CPD event will include refreshments and an opportunity to network with your colleagues and the Roadstone Commercial Innovation team.

To register your interest please contact – info@roadstone.ie

Date Venue Time CPD SEMINAR Duration
7th November 2018 Hibernian Hotel Mallow 5.30pm • Concrete to I.S. EN206 + Case studies
• Paving + Permeable Surfacing Solutions- SuDS
• Aggregates and Standards
Approx 1 hr 30 mins.  Finger Food + Tea/Coffee available from 5pm
14th November 2018 Athlone Springs Hotel 7.30am • Concrete to I.S. EN206 + Case studies
• Paving + Permeable Surfacing Solutions- SuDS
• Concrete Blocks + Part L-Case Studies
Approx 1 hr 30 Mins.  Breakfast available from 7am
20th November 2018 Tullamore Court Hotel 7.30am • Concrete to I.S. EN206 + case studies
• Paving + Permeable Surfacing Solutions- SUDS
• Concrete Blocks + Part L-Case Studies
Approx 1 hr 30 mins.  Tea/Coffee + pastries available from 7am